GDSLAB - HASP dongle troubleshooting - 139
Rowe & Barden Cell - Changing the top bag - 138
High Pressure Consolidation Cell - Changing the main ram seal -
137
Rowe & Barden Cell - Testing using multiple cells -
136
Serial Connectors - Serial cable pin specifications -
135
Triaxial Testing Systems - Useful unit conversions -
134
GDSLAB
Reports - Upgrading -
133
2Hz
MINIDYN - Removing balanced ram - 132
Rowe
Cell - Possible drainage and loading conditions -
131
8Channel
Pad - Changing the main printed circuit board PCB -
130
Triaxial
Testing Systems - Extension testing explanation of the forces acting -
129
Remote
Feedback Module - Main transducer RFM02 setup and calibration -
128
100kN 10Hz Hydraulic System - Hardware Layout -
127
Triaxial
Testing Systems - MINIDYN and ADVTTS40 hardware layout -
126
All
Transducers - Calculating sensitivity and full scale output -
125
GDSLAB and GDSLAB Reports quick installation guide -
124
Top
Caps - New method of fitting Swagelok connectors to perspex top caps -
123
GDSLAB
- Installing drivers for a GDS parallel pad -
121
Power
Supply - GDS hardware power requirements -
120
Load
Cell - Range selection for triaxial testing -
119
IEEE
Interface - Selecting interface card for use with GDS hardware -
118
Hasp
Security Key - Remote update of GDS security key memory - 117
GDSLAB
- Updating to a newer version -
116
GDSLAB
- Quick installation guide and check list -
115
Traditional Triaxial Cell - Extension testing -
113
Triaxial
Testing Systems - Maintenance of triaxial cells -
112
Static
MINIDYN - Quick reference guide -
111
Triaxial
Testing Systems - STD & ADV product explained and compared -
110
Hall
Effect - DIN plug wiring -
109
VIS
Axial Loading System - Quick reference guide -
108
Advanced
Controllers - Quick reference guide -
107
Standard
Controller - Quick reference guide -
106
STD
& ADV Controller - De-airing -
105
Triaxial
Testing Systems - Modified
failure envelope cohesion and angle of friction - 104
Load
Cell - Accuracy and Deviator Stress -
103
8Channel
Pad - Parallel and serial data acquisition -
102
Standard
Controller - PCB boards pre and post sn 2076 -
101
Triaxial
Testing Systems - Static and dynamic axial and radial performance envelopes -
100
Triaxial
Testing Systems - Bishop & Wesley Cell vs Motorised cell -
99
All
Transducers - Accuracy and resolution -
98
Standard
Controller - What is P+V+C+R+A -
97
STD
& ADV Controller - Volume change under constant pressure -
96
STD
& ADV Controller - Changing controller power supplies -
95
Triaxial
Testing Systems - Refurbishment and upgrades -
93
Advanced
Controllers - Motor problems -
92
Triaxial
Testing Systems - Measurement of negative pore pressures -
91
Triaxial
Testing Systems - Procedures for unsaturated testing -
90
STD
& ADV Controller - Pressure fluctuation -
89
CSWS
- System configuration -
88
CSWS
- Test Specifications -
87
CSWS
- Interpretation of results -
85
GDSLAB
- Overview -
84
Triaxial
Testing Systems - Consolidation and saturation -
83
Standard
Controller - Installing RFM & RS232 cables -
82
Standard
Controller - Upgrading or changing firmware chips -
81
STD
& ADV Controller - 'O' Rings -
80
Motorised
Cell - Overview -
79
CSWS
- Geophone
Hz compared - 78
Advanced
Controller High Pressure - Ballscrew and gearbox
alignment - 77
Bishop
& Wesley Cell - Max force and pressure -
76
Hydraulic
Connectors - Fitting Swageloks -
74
Triaxial
Testing Systems - Triaxial consolidation method -
73
Return
of Goods to GDS - Method of shipment -
72
Triaxial
Testing Systems - GDSTAS vs STDTTS -
71
GDSTTS
- Enabling controlled hydraulic gradient v7.10 and above -
70
2Hz
MINIDYN - Setting pressure datum - 69
Load
Cell - Damage to load cells -
68
STD
& ADV Controller - Pressure variation in controllers with a stopped end -
67
STD
& ADV Controller - Pressure control zero offsets -
66
Lemo
Connectors - Using lemo crimp connectors for soldering connections -
65
STD
& ADV Controller - Problems with membrane keypads -
64
2Hz
MINIDYN - Balanced ram leaks - 63
Hall
Effect - Use of hall effect transducers -
62
HTBasic
- Error 163 Interface not present -
61
STD
& ADV Controller - Comparison -
60
Advanced
Controller 100kPa - Release notes for 200cc 100kPa controller -
59
Advanced
Controller 1000cc - Removal and reassembly of piston and ball screw -
58a
Standard
Controller - Removal and reassembly of piston -
58
Motorised
Cell - Removing axial displacement transducer -
57
MINIDYN
- Investigating IEEE error conditions on startup -
56
HTBasic
- Use of function keys -
55
GDSTTS
- Investigating error conditions on system start v7 -
54
Air
Pressure Controller - Use of the air pressure controller -
53
STD
& ADV Controller - Error conditions -
52
Triaxial
Testing Systems - Checking transducer calibrations -
50
GDSTTS
- Investigating error conditions on system start -
49
Triaxial
Testing Systems - Setting the datum of pressure
measurement - 48
Triaxial
Testing Systems - Using the extension top caps -
47
Bishop
& Wesley Cell - Changing bellofram rolling diaphragms -
46
Advance
Controller High Pressure - Piston upgrade -
45
STD
& ADV Controller - RFM & RFM02 setup and calibration -
44
2Hz
MINIDYN - Modification to cell top to prevent backlash -
43
Standard
Controller - Setting zero and gain of pressure measurement -
42
VIS
Axial Loading System - Mark II Changing the load cell range -
41
Advanced
Controllers - Changing transducer from Druck to Microguage -
40
Mid
Plane Pore Pressure Probe - Transducer Access Insert Version -
39a
Mid
Plane Pore Pressure Probe - Installing in a triaxial cell -
39
Dynamic
Hollow Cylinder - Performance specification -
38
Advanced
Controller High Pressure - 64MPa voltage protection board -
37
Advanced
Controllers - Earth path upgrades -
36
DTI
- User maintenance procedures Sn 1146 onwards -
35a
DTI
- User maintenance procedures -
35
Advanced
Controller High Pressure - Fixing collar onto ballscrew connection to gearbox -
34
STD
& ADV Controller - Replacing balls in ball nut - 33
VIS
Axial Loading System - Tightening and
untightening top beam clamping bolts - 32
Advanced
Controllers - Installing RFM module upgrade -
31
GDSTTS
- Release notes v6 use with DTI -
30
STD
& ADV Controller - Replacing touch panel keypad -
29
GDSTTS
- Calculations relating to the triaxial cell -
28
HTBasic
- IEEE handling problem -
27b
GDSTTS
- Installation procedures HTB v3 -
27a
GDSTTS
- Installation procedures HTB v2 -
27
Advanced
Controller High Pressure - Speeds for firmware V4.0 -
26
Triaxial
and Consolidation Testing Systems - Pressure measurement and control -
25
VIS
Axial Loading System - Changing firmware -
24
VIS
Axial Loading System - Machine specification & performance -
23
VIS
Axial Loading System - Setting gain of load measurement -
21
Advanced
Controller 1000cc - Reconnection of motor and gearbox to ball screw -
20
Standard
Controller - Replacement of the 'o' ring seal -
19
STD
& ADV Controller - Hot motors -
18
Computer
- GDS recommended computer specifications -
16
Advanced
Controllers - Setting gain of pressure measurement Mark III -
15
Advanced
Controllers - Setting gain of pressure measurement Mark II -
14
Digital Pressure Interface - Setting gain of pressure measurement -
13
HTBasic
- Security Codes - 11
Power
Supply - Mains electricity supply requirements -
10
Advanced
Controllers - Changing firmware on MkII controller -
9a
Advanced
Controller s - Changing firmware on MkIII controller -
9
Advanced
Controllers - Checking connectors and setting 5V -
8
Advanced
Controllers - PCB removal and replacement -
7
Advanced
Controllers - Installation of pore pressure transducer - 6
Bishop
& Wesley Cell - Lower chamber saturation -
5
STD
& ADV Controller - Beeping, error conditions, and system setup -
4
Triaxial
Testing Systems - Low frequency liquefaction studies -
3
Traditional Triaxial Cell - Installation of pore pressure transducer -
2
Bishop
& Wesley Cell - Installation of pressure transducer yoke -
1
|